November 3, 2026

CT Construction Digest Tuesday November 3, 2026

Revitalizing Constitution Plaza can bring downtown Hartford together

Matt Fleury

Now pending auction, the 1960s-era Constitution Plaza in downtown Hartford is at once a subject of concern and a source of possibility. There’s a way to replace the risk of failing real estate with new uses that unlock the potential of surrounding assets and move Hartford forward.

The Connecticut Science Center, Connecticut Convention Center and the riverfront parks attract more than 1 million people each year, while an equal number attend games and events at the renovated PeoplesBank Arena and Dunkin’ Park to our west.

Yet, too few of these visitors find their way across downtown from one destination to the other, leaving our best assets isolated and downtown less competitive as a place to enjoy, convene, learn, work and live.

This is a moment to think big. Constitution Plaza, where Connecticut residents once gathered for holiday festivals, has handsome buildings and plaza spaces that can be revitalized to complement their newer surroundings rather than compromise them.

Repurposed for hotel rooms, one tower would help the Convention Center compete for multiday conferences and the significant economic benefits they bring, capitalizing on the recent expansion of Bradley International Airport. Apartments, in high demand downtown, could occupy other buildings within the complex.

Perhaps this is the time to build on the longstanding UConn School of Business campus at Constitution Plaza with an expansion and a stronger plaza-level presence. CT State Community College students might benefit from updated classrooms around the tailor-made academic quad at the north end of the plaza, with its original clock tower.

These educational institutions would accelerate Hartford’s progress as a college town and form the northern anchor of a connected learning campus stretching south to UConn Hartford at Front Street, recently enhanced by the addition of Carbone’s restaurant.

Amplified and co-located in this way, higher education is more than a placemaking strategy. It is a steppingstone to careers with surrounding employers, fueled by existing feeders such as the Science Center, Covenant Prep School and, soon, Junior Achievement’s JA BizTown and the recently announced Hartford Innovation Center for applied artificial intelligence at State House Square.

Imagine this ecosystem at the center of our Capital City.

To be sure, rehabilitating Constitution Plaza will require significant capital, likely from both private investors and government sources. Programs are in place to subsidize apartment conversions, rehabilitate vacant commercial buildings and invest in innovation districts and urban placemaking initiatives.

Academic facilities receive ongoing investment, which can be strategically targeted to support a coherent plan to revitalize promising spaces in meaningful places, creating a mutually reinforcing community. The proposed uses could also generate the revenue needed to attract private investment.

Much of Hartford’s existing corporate base and many cultural anchors surround this troubled real estate, along with the riverfront park system and planned housing development across the Founders Bridge in East Hartford.

To revitalize Constitution Plaza is to protect and enhance these valued neighbors, including some of our finest corporate employers and public venues. It will also connect an enviable but disconnected array of assets so they can complement one another and put downtown Hartford on a promising path built on learning, careers and experiences for visitors and residents.


Fairfield approves nearly $12 million for adaptive center, 2 new turf fields

Eric Bedner

FAIRFIELD — Members of the Representative Town Meeting approved millions of dollars for several projects this week, including for an adaptive recreation center and Miracle Field for children with disabilities, as well as new artificial turf fields at two Fairfield high schools.

Construction of an adaptive recreation center for people of all abilities, as well as a Miracle Field specifically designed for children with disabilities were approved by a voice vote at a cost of about $6.3 million. 

Both the recreation center and Miracle Field are planned for 224 Colony St., on a 5.05-acre property formerly known as the Pilot House.

Miracle Fields are designed to be completely flat to make balls bounce more evenly, as well as being accessible to athletes in wheelchairs and with visual impairments. 

“As a parent with children with special needs, these kinds of things are incredibly important,” Representative Chris Carroll, D-8, said.

However, Carroll and other RTM members raised concerns about the lack of information regarding how much taxpayers will be on the hook to operate the recreation center and Miracle Field long-term, including the cost to pay staff.

While both projects are “an exceptional opportunity for this town,” Carroll called it “irresponsible” to not have future costs detailed.

“This should not be the way we do business,” he said, but still voted in favor of the allocation.

Representative Eric Treschuk, D-9, echoed Carroll’s comments, but added the projects would be an “outstanding addition to the town.”

Representative Dru Georgiadis, D-9, said the funding will provide Fairfield with “a one-of-a-kind facility” that can be turned into “a real gem.”

Children and others with disabilities often don’t have as many opportunities to socialize or participate in sports and other recreation, Representative Sharon Pistilli, D-5, said.

“It’s really one of the most important ways we can be investing our funds as a town,” she said.

Along with recreation and socialization, the recreation center will also provide an opportunity for job training, as well as potential revenue if officials choose to rent out the gym there, First Selectperson Christine Vitale said.

RTM members also approved about $2.9 million for a new turf field at Ludlowe High School, and $2.675 million for a new turf field at Warde High School.

Representative Peter Ratzki, D-10, raised concerns about the material used in artificial turf, arguing it could result in harmful health impacts to athletes on the fields.

“I can’t in good conscience vote for this,” he said, but added he probably would have supported the fields if he were the deciding vote.

Some members questioned whether the town should invest in grass fields instead.

Angelus Papageorge, executive director of the operations for the school system, said designs would have to be created to ensure proper drainage, adding grass would also limit sports activity because it takes them longer to recover from heavy rains.

Representative Michelle McCabe, D-4, said the RTM can request a study to examine what a comprehensive shift from turf to grass would entail, but she voted for the artificial turf in the absence of that study.


I-95 lane closures in Connecticut pushed back again. Here’s the new date

Brianna Gurciullo

The start date for a project to clean drainage systems on bridges along Interstate 95 has been pushed back for a second time.

The Connecticut Department of Transportation had initially announced that the cleaning along the highway from New Haven to Greenwich would begin Oct. 26. The start date was then moved to Nov. 1, and DOT also announced that the work would take place in phases, with the first phase including a section of I-95 from New Haven to Milford.

Now, the start of the first phase has been postponed to Nov. 8 “due to contractor availability,” according to a revised DOT notice. An agency spokesperson said the contractor is wrapping up another project.

DOT’s latest notice says Mohawk Northeast Inc. will perform the work. Previously, it said Latec LLC was the contractor.